MLM Fully Promotes the Opening of New Routes
After Exiting the LRT station via Elevators Passengers can Conveniently Walk to the Departure Hall
Macao Light Rapid Transit Corporation, Limited. (hereinafter referred to as the "MLM") strives to provide convenient LRT services. The LRT "Hengqin Line," scheduled to be in service in 2024, will offer residents and travelers a comfortable and quick travel option to the Macao Port Zone of Hengqin Port, facilitating personnel and economic exchanges and adding new momentum for Macau's integration into the Greater Bay Area development.
In the future, passengers who need to cross at Hengqin Port to the mainland can take the train from "Lotus Station" of "Hengqin Line," passing through a underwater tunnel under the Shizimen Waterway with the length of about 900 meters, arriving at "Hengqin Station," which is located underground in the Macao Port Zone of Hengqin Port. After leaving the station via elevators or escalators, passengers can easily walk to the departure hall. Travelers arriving in Macao can also take the "Hengqin Line" and transfer to the Macao LRT "Taipa Line" or the "Seac Pai Van Line," which is commenced passenger service in November 2024, to travel to various locations of Macao.
The "Hengqin Line" is about 2.2 km in length and consists of 2 stations: "Lotus Station" and "Hengqin Station." MLM is making every effort to prepare for the opening of this new line and hopes to continue providing passengers with high-quality service.